Engineering & Innovation
Success Story
Success Story
Problem:
Existing 7 step stainless valve mfg process was costly and unreliable.
Solution :
Design custom “proprietary” machine to combine all drilling, milling, assembly, and test steps into 1 operation.
Results:
Lead time reduced 400%; Cost reduced 500%; Zero defect goal achieved.
© Copyright 2006 HY-LEVEL INDUSTRIES. All rights reserved. Site designed and hosted by
Mango Bay Internet.
Reproduction of any part of this site is strictly prohibited.